MT Management Technology
01 / 01

Construction of a technical building

Time period: 12.06.2017. - 22.10.2017.
Address: Durbe Municipality, IP. „Kaimiņi”
Client: Z/S

Completed work

  • Construction of foundations
  • Assembly of metal structures, panelling of walls with Rukki P 20 roof, wall profile sheets
  • Assembly of sliding gates
  • Pouring of a concrete floor, levelling